Interactive note · 4D systems

Move the date.
Read the building.

A small demonstration of the idea behind much of the portfolio: a schedule is not a table beside a model. It is a state engine for the model.

Current time Week 1
Active work Mobilisation
X
Y
Z
Activity0255075100%
MobiliseStructureEnvelopeServicesHandover

What the demo abstracts

Real 4D is a graph of relationships.

The visible animation is the last mile. Upstream, model elements need stable identities; activities need calendars, logic and progress; and the mapping between them needs review, undo and validation.

  • 01 Normalize model and schedule data
  • 02 Link objects to activities and states
  • 03 Solve time, variance and constraints
  • 04 Render the answer for a human decision

Portfolio capability map

Follow the data.

Choose a layer to see the pattern repeated across otherwise different products.

Go deeper

See how the full systems solve it.

TessarAKT V58 BIM 4D Suite AK Plannex